Seen here are the new doors which will be installed on all BC Transit buses. (Evan Taylor/News Staff)

BC Transit starts outfitting buses in Greater Victoriawith doors to improve driver safety

The $6.5 million project will see all buses equipped with the new doors by the end of 2020

Citing safety as its top priority BC Transit is equipping buses with full driver doors. The doors create more of an enclosure for the drivers, creating a barrier between them and riders.

The project started this year and will continue throughout 2020. The first bus testing them rolled out Thursday, Oct. 3 in Victoria.

READ MORE: Protective doors for BC Transit drivers coming later this year

Communications Manager for BCT, Jonathon Dyck says newer buses will not need to go through this process.

“Retrofitting is underway with all the buses being scanned, from now on any new buses will come with the full driver doors already equipped.

The enclosures offer the drivers more physical protection and also help with riders trying to speak with drivers while operating a bus, says Dyck.

“It changes the dynamic between riders and operators, that will take time to get used to but in the end, it will improve safety.”

The retrofitting process is quite time-consuming. Each bus needs to be digitally scanned as buses manufactured in different years could have minor variations in dimensions. The process takes two hours per bus to ensure accuracy.

Each retrofit is estimated to cost approximately $10,000. The cost of the whole project is $6.5 million.

The installation of the doors on the buses being retrofitted will all be handled by BC Transit. All installations on new buses will be done by the doors manufacturers AROW Global Corporations. The cost of installations on new buses is not included in the $6.5 million figure.

READ MORE: BC Transit launches GPS bus tracking system across Greater Victoria

In Victoria, there are 186 buses that qualify for retrofitting, in all of B.C., there are 650. Buses that are due to go out of service in the next two years will not be equipped with the doors.

The retrofitting to be done in Victoria is set to be completed by early 2020, at which point they will begin installations on Kelowna based buses.

evan.taylor@vicnews.com


@evanrtaylor
Like us on Facebook and follow us on Twitter.

BC Transit

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Recent arrests skim surface of Victoria’s human trafficking problem

Port city makes desirable place for traffickers flying under the radar

Oak Bay athletes rule the slopes at Island ski and snowboard series

Oak Bay boys take top ski, snowboard honours

Two-vehicle crash in Langford sends one to hospital Monday morning

Driver sent to hospital with unspecified injuries

Victoria Canadian Forces member honored with exceptional Rotary Club award

Capt. Jacqueline Zweng is the Western Canada Ambassador of Wounded Warriors Canada

B.C. budget expected to stay the course as economic growth moderates

Finance minister said ICBC costs have affected budget

VIDEO: Ottawa wants quick, peaceful resolution to pipeline protests, Trudeau says

The protests have manifested themselves as blockades on different rail lines across the country

New highway proposed between Alberta and B.C.

The route would connect Red Deer to Kamloops

Wet’suwet’en and B.C. government have been talking Aboriginal title for a year

Coastal GasLink says it has agreements with all 20 elected First Nations councils along the 670-kilometre route

Trudeau tightlipped on plan to end protests ‘quickly and peacefully’

The prime minister, who cancelled a two-day trip to Barbados this week to deal with the crisis at home

Canadian standards for coronavirus protection to be reviewed, health agency says

The protocols set out how health workers should protect themselves and their patients

Monday marks one-year anniversary of man missing from Langley

42-year-old B.C. man, Searl Smith, was last seen leaving Langley Memorial Hospital on Feb. 17, 2019

Amtrak warns of delays as railways from Seattle to B.C. blocked by Wet’suwet’en supporters

Coastal GasLink said it’s signed benefits agreements with all 20 elected band councils along pipeline route

Federal emergency group meets on pipeline protests as rail blockades continue

There’s mounting political pressure for Trudeau to put an end to the blockades

VIDEO: Minister reports ‘modest progress’ after blockade talks with First Nation

Wet’suwet’en hereditary chiefs say Coastal GasLink does not have authority to go through their lands

Most Read