Watch for construction crews if you’re heading along Metchosin Road to the Royal Bay area from May until mid July.
New trees and landscaping work are underway 7 a.m. to 5 p.m. Two lane traffic is expected to remain the same, but the bike lane will be closed for five to seven weeks.
Traffic control will be on site to remind drivers to slow down and use extra caution as work takes place on the west side of Metchosin Road. The project is expected to be completed before or by July 13.
Recently, Royal Bay developer GableCraft Homes installed a new sidewalk, bike lane and pedestrian lighting along the west side of Metchosin Road from Latoria Boulevard all the way up the hill to Cotlow Road.
Notably, this project doesn’t include the installation of a traffic light at Metchosin Road and Latoria Boulevard, but it’s planned in the area as development continues.
READ MORE: Colwood eyes upgrades to recreation area near Lookout Lake Dam
ALSO READ: Drunk pedestrian hit by sober driver in Colwood
@iaaronguillen
Like us on Facebook and follow us on Twitter.