A rendering of the four hybrid-electric Island Class vessels that will join the BC Ferries fleet in 2022. (Courtesy of BC Ferries)

BC Ferries budgets $200M to add four more hybrid-electric vessels to fleet

Vessels expected to arrive in 2022

BC Ferries has plans to add four more hybrid-electric ships to its fleet.

A contract has been awarded to Netherlands based Damen Shipyards Group to build four more battery hybrid-electric Island Class vessels scheduled to go into service in 2022. In the spring of 2017, BC Ferries gave the same company contracts to build two of the hybrid-electric vessels which have successfully completed sea trials and are expected to arrive in Victoria by January 2020.

Damen Shipyards Group will also extend its agreement with Point Hope Shipyards in Victoria to provide technical and warranty support for the new vessels with their local staff.

“Our Clean Futures Plan spells out our strategy to reduce GHG emissions by replacing our legacy carbon intensive fossil fuelled vessels with ships using clean energy,” said Captain Jamie Marshall, vice president of business development and innovation with BC Ferries, in a statement. “These next four Island Class ships are a major step in our plan to progressively lower emissions across the fleet and be a leader in the energy transition to a lower carbon future.”

READ ALSO: BC Ferries invites Greta Thunberg to tour new ‘clean’ ferries

The Island Class vessel is a battery-powered ferry and when electric charging technology becomes advanced enough to make electricity available in the quantities needed, BC Ferries said it will operate the new ships as completely electric ferries using clean energy. In the meantime, the ships will use an on-board, low sulphur, diesel hybrid system.

BC Ferries said the agreement with Damen Shipyards Group is a design-build, fixed-price contract giving BC Ferries guarantees when it comes to delivery dates, performance criteria, cost certainty and quality of construction. According to BC Ferries, the total budget for the project is about $200 million.

The first two Island Class ships will be seen on the Powell River-Texada Island route and the Port McNeill-Alert Bay-Sointula Island route by mid-2020.

The third and fourth vessels will service the Campbell River-Quadra Island route and the last two will serve the Nanaimo Harbour-Gabriola Island route by 2022.

READ ALSO: Hybrid vessels part of B.C. Ferries’ plans to reduce emissions

BC Ferries said replacing one larger ship with two smaller vessels will give customers more frequent service, increased passenger capacity per hour, reduced vehicle line-ups, improved safety and reduced congestion on local roads. The vessels will have the capacity to carry at least 47 vehicles and up to 300 to 450 passengers and crew depending on configuration.

Some highlights of the vessels besides the electric power and battery-hybrid power are that the exhaust system reduces Nitrogen oxide emissions, twin propellers on the ships are designed to reduce underwater radiated noise, they’re designed to be fully accessible without elevators to reduce energy consumption, they are completely outfitted with LED lights, the heat recovery system uses waste thermal energy to heat the vessel and they offer comfortable passenger lounges and solariums.

In 2018, BC Ferries issued a request for expressions of interest to construct the four latest vessels. Eighteen responses were received from international shipyards which were short-listed to 9. No Canadian companies submitted a bid.

Damen Shipyards Group operates 36 shipbuilding and repair yards around with world with 12,000 employees. The company delivers about 175 vessels annually worldwide.

shalu.mehta@goldstreamgazette.com


Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Fiddler on the Roof brings timely message to Oak Bay stage

Musical starts Friday in Dave Dunnet Theatre

UPDATED: Pat Bay Highway blockade ends three hours later

About 80 people from four major Peninsula First Nations blocking major highway

Saanich students get on board Walking School Bus

Rogers Elementary students led by teachers and Saanich Police in new initiative

City of Langford rebrands, announces several projects

‘Langford, where it all happens’ is the City’s new slogan

Central Saanich Police prepared for afternoon shut-down of Highway 17

Sgt. Paul Brailey questions efficacy of protest

VIDEO: Province promotes ‘lifting each other up’ on 13th annual Pink Shirt Day in Victoria

Students, MLAs, community members gathered at B.C. Parliament Buildings Wednesday

Greater Victoria Crime Stoppers wanted list for the week of Feb. 25

Greater Victoria Crime Stoppers is seeking the public’s help in locating the… Continue reading

Prepare for new coronavirus like an emergency, health minister advises

About 81,000 people around the world have now become ill with COVID-19

B.C. residents in Wet’suwet’en territory have right to police presence: Public Safety Minister

Nevertheless, Bill Blair said officials remain ‘very anxious’ for the barricades to come down

Winnipeg police investigating graffiti on RCMP and other buildings

Manitoba Justice Minister Cliff Cullen denounced the vandalism

B.C. seniors’ watchdog calls for better oversight after recent problems at Retirement Concepts care homes

‘There is no financial incentive right now to be a good operator’ - Isobel Mackenzie

Trucking company fined $175K for Kootenay creek fuel spill

Decision handed down last Friday in Nelson court

B.C. Liberals call for ban on foreign funds to pipeline protesters

Sierra Club, Wilderness Committee back Coastal GasLink blockades

Most Read